Login — identify yourself
Choose your name, enter PIN, select your station/bay, then press LOGIN. Work time starts only after Work Prep is completed.
Work Prep — station must be ready before work starts
No device work before this is complete. Take photos, print and scan test label, confirm tools, then press START WORK. Work time starts after this approval.
Take photo of the full table, printer, scanner and working area.
Take photo of chargers, Capture USB, USB-to-LAN, labels, service cards and bin cards.
Print the REDIVIVIS work prep test label. Then scan it back below.
Click field and scan any bin/service/asset code. It must enter text and press ENTER.
Terms / Glossary — use the same words every time
Simple definitions for the floor team. This reduces mistakes and avoids different people using different names for the same thing.
Tag device — one device only
Container / pallet fields — team lead only
Capture technical data
Tagged device from your table.
Known-good charger + LAN/USB-to-LAN where available.
REDIVIVIS Capture USB for this bay.
Station: None
Take required photos for AI grading
Do not decide grade here. Take the exact photos shown below. AI / BI-DATA will review. If photos are bad, device goes to PHOTO RETAKE.
Closed laptop / top of device. Full device visible.
Open laptop front view. Keyboard + screen frame visible.
Screen powered on. Avoid glare.
Close enough to see keys, wear, missing keys.
Flip device. Full bottom visible.
If crack, dent, missing part or heavy wear exists, take close-up. If no defect, optional.
Photo / visual grade
Only choose the visual grade. Press ONE grade button. The system will automatically decide Retail / Project / Wholesale / Repair / Parts and send you to the Bin screen.
Supervisor only: override tech/battery note if needed
Automatic system route
Route is calculated automatically from Capture data + Grade. Do not change it on the floor.
Move to correct bin
Route on screen.
Carry device to matching color/bin.
Scan destination bin card. Wrong bin = STOP.
Clear bench — nothing left loose
Do not start the next device until this is done. The system must confirm that the device, paper card, charger, USB/LAN and tools are in the right place.
Device complete
The device is in the correct bin and the bench is clear. Start the next device or clock out.
Problem / Ticket — stop guessing, report it
Use this when work cannot continue normally. The ticket goes to Daniel / Joshua / Emmanuel / BI-DATA / Arvet for resolution.
Printer, scanner, Capture USB, charger, bin, device issue or other.
Scan/type asset tag if it belongs to one device. Add photo if helpful.
STOP_WORK priority means do not continue on that station.
Issue Tickets
Open problems from the floor. Assign, resolve or send back with instruction.
Manual capture approval
Use only when Capture USB fails. BI-DATA / Lead / Manager / Arvet must check and approve. Manufacturer and model are normalized by system.
Manager Dashboard
Prepare Capture USB package
This creates the small REDIVIVIS_CAPTURE package for one capture bay. Copy it to an Ubuntu/Debian live USB. The floor team must not edit these files.
Example: CAP-01-A. Each bay needs its own station ID.
Download configured ZIP from the server.
Extract ZIP and copy REDIVIVIS_CAPTURE folder to the Capture USB.
The technical data is read by the laptop booting Capture USB. Phone/tablet is only for scan and workflow.
Scanner + printer readiness test
Use this before production starts. The workstation must scan and print before the operator touches devices.
USB HID keyboard mode. Suffix must be ENTER/CR. Scan into the field below.
Direct thermal, 203 DPI, label size 55mm × 30mm. USB printer installed on Windows.
If scanner or printer fails, do not start production on that station.
Compatible scanners: Zebra DS22/DS2208-type USB scanner, VEEDA USB scanner, generic 1D USB scanner — if set to keyboard mode.
Compatible printers: Xprinter XP-365B USB 203 DPI and Zebra GK420d 203 DPI, after Windows driver setup and correct label size.
Customer order routing
Managers create order. Floor only scans order / asset / outbound container.